EOS Zeus S / EOS Zeus SL - Installation and Operating Instructions
EN-37
Commissioning
5
Commissioning
Before the heater can be commissioned, it must be filled with the sauna
stones.
The heater is switched on via the control unit. It is operated via the control
panel.
WARNING
Fire hazard
Objects placed on the heater could catch fire. Herbs
or similar substances used for aroma infusion pur-
poses, which are located near the heater, could
catch fire.
Inspect the cabin prior to each use.
WARNING
Risk of fire due to heating without stones
The heater must be operated with stones for the air to escape op-
timally. Stones that are positioned too close together in the heater
prevent hot air from being exhausted. This leads to overheating of
the heater.
Start the heater only if it has been filled with stones.
Place the stones loosely on the stone grate.