EN-30
Installation and Operating Instructions - EOS Zeus S / EOS Zeus SL
EN Installation
9
Reassemble the heater:
a)
Place the heating element on the tubular heating elements in the
heater and tighten the screws.
Lay the connection cable looped in an appropriate place.
b)
Insert the stone grate and tighten the screws.
c)
Position the decoration ring and tighten the screws.
d)
Place the stones in the rock store.
Do not lay stones on the decoration ring.
Only use stones with a grain size of 50–80 mm.
See 5.1 Filling stones,
10
Start the heater.
4.2.4 Establishing an electrical connection,