4.
Put the guide nut up in the M30 bolt
to avoid the tower to fail down. Once
the tower base plate has contacted the
guide nut, loosen this until the tower is
in vertical position.
5.
Level the tower placing 2 levels in
the conical shape of the tower at 180º.
Move the base M30 nuts to get the
same levelling in both sides.
Repeat this operation in all
sides.
6.
Once the tower is levelled, tighten
the M30 nuts under and above the
tower base plate.
7.
To guarantee the M30 nuts don't get
loosen, place a 2
nd
safety nut or apply
Loctite 243 as threadlocker (both
solutions are valid).