Code: I.H4.V10.3003
Installation and Maintenance Manual
Version: 07
22 / 66
Ennera Energy and Mobility, S.L.
This document contains confidential information which is property of Ennera Energy and Mobility, S.L. The copy, transmission or use by other people, of the whole document or
part of its contents, is not allowed without written permission from Ennera Energy and Mobility S.L.
2.
All covers (up and side panels) are
removable to have an easy access to the
components.
3.
To open the box, unbend the fixing
plates to open the covers.
5.7.2.
Yaw
1.
Attach the tower cable (3x6mm
2
)
(W7) to the cable guide and pass it
through the tower.
2.
Fix the tower cable inside the tower
with the M20 cable gland. Tighten the
cable gland strongly to support the
tower cable weight.
3.
Leave 350mm of the cable out of the
tower.
W7