5.3.
Ennera design 2-section tower assembly
1.
In case the tower is a 2 section
tower (plus the cylindrical pipe), the
interference distance is 705mm.
2.
The assembly process is the same
than multi-section tower.
5.4.
Ambor design 3 section tower assembly
1.
In case the tower is an Ambor design
3 section tower, the assembly process is
the same.
2.
The interference (slip) between the
first and second tower sections is 700 ±
240mm.
3.
The interference (slip) between the
first and second tower sections is 650 ±
240mm.
5.5.
Lifting mechanism
1.
The tractel fixing point should be
located 7m away from the foundation
area, aligned with the tower. See Annex
6.
2.
The tractel fixing point (EL-1) should
have a disk of 150mm diameter and a
length of 1.5m.
705mm