
29
IOM, BS/BT Models
Enertech Global
Section 6: Unit Piping Installation
Typical Unit Piping Connections
Figure 12: Pressurized Flow Center
Figure 13: Non-Pressurized Flow Center
Equipment Pad
2” Polythylene Foam
Equipment Pad
2” Polythylene Foam
Figure 14: External Flush Valves
Equipment Pad
2” Polythylene Foam
Note:
P/T ports should be angled away from the
unit for ease of gauge reading.
Drawings represent typical installation. The
manufactures installation guides should be used for
final installation.