
22
Enertech Global
IOM, BS/BT Models
Water
Flow
Entering
Water
Temp.
Entering
Air DB
Temp.
GPM/Ton
°F
°F
018
024
036
048
060
072
45
TBD
TBD
4
6
TBD
6
50
TBD
TBD
4
5
TBD
5
60
TBD
TBD
3
4
TBD
4
70
TBD
TBD
3
3
TBD
3
75
TBD
TBD
3
2
TBD
2
80
TBD
TBD
3
2
TBD
1
85
TBD
TBD
2
1
TBD
1
45
TBD
TBD
4
10
TBD
8
50
TBD
TBD
3
8
TBD
8
60
TBD
TBD
3
6
TBD
6
70
TBD
TBD
3
4
TBD
5
75
TBD
TBD
3
4
TBD
4
80
TBD
TBD
3
3
TBD
3
85
TBD
TBD
3
3
TBD
3
45
TBD
TBD
2
5
TBD
5
50
TBD
TBD
2
4
TBD
4
60
TBD
TBD
2
3
TBD
3
70
TBD
TBD
2
2
TBD
2
75
TBD
TBD
2
2
TBD
2
80
TBD
TBD
2
1
TBD
1
85
TBD
TBD
2
1
TBD
1
45
TBD
TBD
2
8
TBD
5
50
TBD
TBD
2
7
TBD
5
60
TBD
TBD
2
5
TBD
5
70
TBD
TBD
2
3
TBD
4
75
TBD
TBD
2
3
TBD
3
80
TBD
TBD
2
2
TBD
2
85
TBD
TBD
2
2
TBD
2
45
TBD
TBD
2
4
TBD
4
50
TBD
TBD
2
3
TBD
4
60
TBD
TBD
2
2
TBD
3
70
TBD
TBD
2
2
TBD
2
75
TBD
TBD
2
1
TBD
1
80
TBD
TBD
2
1
TBD
1
85
TBD
TBD
2
1
TBD
1
45
TBD
TBD
2
6
TBD
5
50
TBD
TBD
2
6
TBD
4
60
TBD
TBD
2
4
TBD
4
70
TBD
TBD
2
3
TBD
3
75
TBD
TBD
2
2
TBD
3
80
TBD
TBD
2
2
TBD
2
85
TBD
TBD
2
2
TBD
1
*Cooling approach temperature=Liquid line Temperature Eneter Water Temperature
(should be within ± 1
o
F)
Approach Temp. by Model,
o
F
Full Load--Desuperheater Off
1.5
70
1.5
80
3.0
80
2.25
70
2.25
80
3.0
70
Section 5: Line Set Installation