Operate power generator ESE 604 DHG DIN
Status at: October 2018
ESE 604 DHG (ES) DIN
35
The following requirements must be met:
An even and firm substratum outdoors
There are no inflammable materials at the operating site
There are no explosive materials at the operating site
WARNING!
Leaking engine oil and petrol can contaminate the soil
and groundwater.
Prevent leaking of engine oil and petrol.
Set up the generator as follows:
1.
Prepare the work site.
2.
Transport the generator to the work site.
3.
Attach the exhaust hose if necessary (a special accessory
see 3.1.4.2)
The generator is set up and ready for use.
4.3
Refuelling the generator
Proceed as follows to refuel the generator.
The following requirements must be met:
The generator must be switched off (see 0).
the device must be cooled down.
Adequate ventilation must always be available
Appliances switched off or disconnected
WARNING!
Leaking engine oil and petrol can burn or explode!
Requirements
Setting up the generator
Requirements
Summary of Contents for ESE 604 DHG DIN
Page 11: ...General information Status at October 2018 ESE 604 DHG ES DIN 11 Notes...
Page 26: ...General Safety Regulations 26 ESE 604 DHG ES DIN Status October 2018 Notes...
Page 49: ...Operate power generator ESE 604 DHG DIN Status at October 2018 ESE 604 DHG ES DIN 49 Notes...
Page 81: ...Troubleshooting Status at October 2018 ESE 604 DHG ES DIN 81 Notes...
Page 85: ...Technical specifications Status at October 2018 ESE 604 DHG ES DIN 85 Notes...