Magphant
Commissioning
Hauser
27
9
Commissioning
9.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → 20
• "Post-connection check" checklist → 24
9.2
Switching on the measuring device
Once the supply voltage has been switched on, the measuring device adopts the normal
mode.
9.3
Configuring the measuring device
Settings can be made at the measuring device with the operating and display interface.
Summary of Contents for magphant
Page 43: ......
Page 44: ...www addresses endress com ...