Transport and storage
multi N/C pharma UV
98
9.3
Recommissioning after transport or storage
9.3.1
Assembling the analyzer after transport or storage
When positioning the analyzer observe the notes in section "Site requirements" p. 36.
1.
Carefully remove the basic device, accessories and any add-on devices from the
transport packaging. Do not damage the transport packaging!
2.
Position the analyzer at the intended location.
3.
Remove the adhesive tape from the doors and side walls. Open the doors.
4.
Remove all remaining adhesive tape and protective bags.
5.
Install the halogen trap and the water traps (the water traps are connected to the
halogen trap) (see sections "Replacing the halogen trap" p. 77 and "Replacing the
6.
Install the TIC condensate container (see section "Cleaning the TC condensation
vessel" p. 79).
7.
Close the doors of the analyzer.
9.3.2
Connecting the analyzer
CAUTION
Always connect the system components to the multi N/C pharma UV when it is
switched off!
Before connecting the mains cable ensure that the main switch on the back of the
equipment is set to "0"!
Only use the IEC connection cable included in the scope of delivery for the connection
to the mains supply (VDE label, 1.5 m long). Extensions of the supply cable are not
permitted!
ATTENTION
Settled condensation and temperature differences can damage individual components
of the analyzer during recommissioning.
Allow the analyzer multi N/C pharma UV to acclimatize for at least one hour before
commissioning after positioning it in the operating room.
The mains connection and media connections are on the analyzer backplate.