GB
64
C1
C2
C3
PE1
N1
L1
PE
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
Brown
Brown
Brown
Black
Blue
Blue
Blue
Blue
Brown
White
Contatore
d’acqua
Sonda ACS
Brown
Riscaldatore
elettrico
integrativo
ACS
Valvola
motorizzata
3 vie
Anodo
elettronico
Kit Circolatore
P2
Quadro di collegamento e morsetti dell ITM-200 B
Morsettiera A
Morsettiera B
ITM-200 B connection panel and terminals
Integrative
electrical
heater
DHW
P2
Circulator kit
Electronic anode
Motorized
3-way valve
DHW sensor
Water meter
Terminal block A
Terminal block B
Note: The cable must be laid in dedicated pipelines, separated from power cables and away from sources of disturbance.
The system must be built in accordance with the relevant project and in compliance with the regulations in force at the place of instal-
lation. Otherwise, the company declines any responsibility regarding the proper functioning of the system built.
1 Electrical panel
2 Electrical connections input
DHW sensor
Technical data
• NTC 10 kOhm at 25 °C
• Temperature range: -50 °C ÷ +110 °C
Terminal block A: the maximum length allowed for connection between the DHW sensor and the heat pump 20 m
Terminal block B : Use the cable suitable for the absorptions of the various components present
1
2
2
Summary of Contents for ECO HYDRO KIT ITM-200 B
Page 1: ...ECO HYDRO KIT ITM 200 B MANUALE INSTALLAZIONE ED USO INSTALLATION AND USE MANUAL Rev B 04 2021...
Page 14: ...IT 14 Esempio di installazione 1 Eco Hydro kit ITM 200 B 2 Pompa di calore MIRAI SMI...
Page 43: ......
Page 56: ...GB 56 Installation example 1 Eco Hydro kit ITM 200 B 2 MIRAI SMI heat pump...
Page 78: ...GB 78...