8.
Rotate the PCB assembly to the desired position and line up the standoffs with the
mounting holes.
9.
Insert standoffs in the appropriate horizontal or vertical mounting holes.
10.
Tighten standoffs to secure the PCB assembly.
11.
Replace faceplate and tighten
Pull Here
knobs.
12.
Return power to the detector and replace the housing cover.
PCB Assembly Rotated
Figure 2-9:
2.5.7
General requirements
WARNING!
Do not open the transmitter, sensor, or junction box enclosure when in a classified area or when an
explosive atmosphere may be present unless the power to the transmitter has been removed.
When connecting cable wires, use a small screwdriver to gently press down and hold the
spring connector open. Insert the appropriate wire into the open connector hole, releasing
the screwdriver to secure the wire as shown in
Figure 2-10
.
The connector will accommodate wire sizes between 14 and 20 AWG.
Installation
13
Summary of Contents for Net Safety Millennium
Page 4: ......
Page 8: ...Contents iv ...
Page 14: ...Transmitter Dimensions Figure 2 3 Junction Box Sensor Dimensions Figure 2 4 Installation 6 ...
Page 34: ...Operation 26 ...
Page 42: ...Programming flowchart Figure 4 2 Programming 34 ...
Page 46: ...Maintenance 38 ...
Page 48: ...Electrostatic sensitive device 40 ...
Page 50: ...Wire resistance table 42 ...
Page 54: ...Specifications 46 ...
Page 60: ...Ordering information 52 ...
Page 61: ...Ordering information 53 ...
Page 62: ...Ordering information 54 ...
Page 63: ...Ordering information 55 ...