Current source and sink drawing
Figure 2-15:
2.8
Installation checklist
Review the following checklist prior to turning the power on to the transmitter after
installation has been completed:
•
Ensure that the transmitter and sensor are properly and firmly mounted.
•
Ensure that stopping plugs are securely tightened on any unused conduit entries.
•
Ensure that the transmitter and sensor are not obstructed, such that they are
accessible and the particulate matter is not inhibited from reaching the sensors
optical path.
•
Ensure adherence to applicable local guidelines and requirements on wiring and
sealing of equipment in hazardous and non-hazardous areas.
•
Ensure that proper shielding and grounding practices are adhered to and local codes
are being followed.
•
Check system operational voltage and conditions and ensure that they are within
the applicable specifications of the transmitter and sensor.
•
Verify wiring at all termination and junction points (transmitter, junction box, and
power supply).
•
Ensure that the transmitter housing cover and sensor cap are tightly secured.
Installation
20
Summary of Contents for Net Safety Millennium
Page 4: ......
Page 8: ...Contents iv ...
Page 14: ...Transmitter Dimensions Figure 2 3 Junction Box Sensor Dimensions Figure 2 4 Installation 6 ...
Page 34: ...Operation 26 ...
Page 42: ...Programming flowchart Figure 4 2 Programming 34 ...
Page 46: ...Maintenance 38 ...
Page 48: ...Electrostatic sensitive device 40 ...
Page 50: ...Wire resistance table 42 ...
Page 54: ...Specifications 46 ...
Page 60: ...Ordering information 52 ...
Page 61: ...Ordering information 53 ...
Page 62: ...Ordering information 54 ...
Page 63: ...Ordering information 55 ...