MPS-4009 Multi-Chemistry Power Supply Operations Manual Supplement, Doc. No. L01-497
41
InterMetro Industries Corporation
3. Place the third SLA with rubber band wrapped around it vertically next to the other two
SLA batteries as shown below. Connect all positive and negative battery terminals to
the SLA’s.
Note:
Check all positive and negative terminals for accuracy. Tighten the Velcro straps to
secure the SLA batteries on the battery tray.
Connect Terminals to SLA Batteries
4. Install the battery tray inside the Green Cubes Power Supply compartment as shown in
figure below.
Installation of Battery Tray