9.3.1
Disassemble internal meter housing components - NPS
3 through 24
Procedure
1. Remove the downstream shaft nut, simultaneously holding the upstream shaft nut
to prevent the shaft from turning.
Figure 9-1: Downstream shaft nut removal
Important
The shaft nut can only be reused up to five times. Replace as needed.
2. Remove the downstream hanger assembly from the shaft.
a) Remove the shaft in the upstream direction to allow the insertion of a pin
into the hole in the downstream hanger hub.
b) Push the shaft back against the pin and tap the shaft lightly to free the
downstream hanger assembly.
User manual
Planned maintenance
P/N 3-9008-515
March 2019
User manual
87
Summary of Contents for Daniel Series
Page 2: ...2 ...
Page 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Page 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Page 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Page 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Page 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...