Figure 9-6: Upstream cone removal
7. Remove the upstream hanger assembly from the opposite end.
a) To do this you must insert a pin into the hole in the upstream hanger hub.
b) Insert the shaft from the downstream end and push the shaft against the pin.
c) Tap the shaft lightly to free the downstream hanger assembly.
Figure 9-7: Upstream hanger assembly removal
Planned maintenance
User manual
March 2019
P/N 3-9008-515
90
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Summary of Contents for Daniel Series
Page 2: ...2 ...
Page 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Page 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Page 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Page 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Page 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...