2. Connect a further Ethernet cable to the other RJ-45 socket and connect this cable to
one RJ-45 socket of the 100 Mbit/s switch of the second AMS Asset Monitor.
3. Continue connecting AMS Asset Monitor as described in
Monitors are part of the DCN.
Connect AMS Asset Monitor in a star network
Figure 4-20: RJ-45 sockets
A. RJ-45 sockets of the 100 Mbit/s Ethernet switch
Procedure
1. Connect the Area Controlled Network (ACN) to the Ethernet switch.
2. Connect one RJ-45 socket of the 100 Mbit/s switch of the AMS Asset Monitor to the
Ethernet switch.
until all AMS Asset Monitors are connected to the Ethernet
switch.
Connect AMS Asset Monitor in a hybrid network
Procedure
1. Connect the AMS Asset Monitors to be daisy-chained as described in
Asset Monitor in a daisy-chained network
2. Connect the remaining AMS Asset Monitors to the Ethernet switch as described in
Connect AMS Asset Monitor in a star network
.
Installing AMS Asset Monitor hardware
Installation Guide
April 2020
MHM-97923-PBF
46
MHM-97923-PBF, Rev. 1.0
Summary of Contents for AMS
Page 8: ...Contents Installation Guide April 2020 MHM 97923 PBF viii MHM 97923 PBF Rev 1 0 ...
Page 14: ...General Installation Guide April 2020 MHM 97923 PBF 14 MHM 97923 PBF Rev 1 0 ...
Page 72: ...Removing CHARMs hardware Installation Guide April 2020 MHM 97923 PBF 72 MHM 97923 PBF Rev 1 0 ...
Page 86: ...Technical data Installation Guide April 2020 MHM 97923 PBF 86 MHM 97923 PBF Rev 1 0 ...
Page 88: ...Certificates Installation Guide April 2020 MHM 97923 PBF 88 MHM 97923 PBF Rev 1 0 ...
Page 89: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 89 ...
Page 90: ...Installation Guide April 2020 MHM 97923 PBF 90 MHM 97923 PBF Rev 1 0 ...
Page 91: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 91 ...