Figure 4-18: Network topology – hybrid
A. First RJ 45 socket of the Ethernet switch (ACN/LAN)
B. Second RJ 45 socket of the Ethernet switch (ACN/LAN)
C. RJ 45 socket for connection to WAN for configuration of the AMS Asset Monitor and
connection to subsequent systems such as Plantweb Optics
D. Optional connection, if no connection between switch and ACN
E. Connection to an Area Controlled Network (ACN)
F. Switch
Connect AMS Asset Monitor in a daisy-chained network
Figure 4-19: RJ-45 sockets
A. RJ-45 sockets of the 100 Mbit/s Ethernet switch
Procedure
1. Connect the Area Controlled Network (ACN) to one RJ-45 socket of the 100 Mbit/s
switch of the first AMS Asset Monitor.
Installation Guide
Installing AMS Asset Monitor hardware
MHM-97923-PBF
April 2020
MHM-97923-PBF, Rev. 1.0
45
Summary of Contents for AMS
Page 8: ...Contents Installation Guide April 2020 MHM 97923 PBF viii MHM 97923 PBF Rev 1 0 ...
Page 14: ...General Installation Guide April 2020 MHM 97923 PBF 14 MHM 97923 PBF Rev 1 0 ...
Page 72: ...Removing CHARMs hardware Installation Guide April 2020 MHM 97923 PBF 72 MHM 97923 PBF Rev 1 0 ...
Page 86: ...Technical data Installation Guide April 2020 MHM 97923 PBF 86 MHM 97923 PBF Rev 1 0 ...
Page 88: ...Certificates Installation Guide April 2020 MHM 97923 PBF 88 MHM 97923 PBF Rev 1 0 ...
Page 89: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 89 ...
Page 90: ...Installation Guide April 2020 MHM 97923 PBF 90 MHM 97923 PBF Rev 1 0 ...
Page 91: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 91 ...