![EMC VCE VxRail 120 Product Manual Download Page 69](http://html1.mh-extra.com/html/emc/vce-vxrail-120/vce-vxrail-120_product-manual_2399738069.webp)
3
If the bezel has a lock, insert the key and turn the key to lock the bezel.
CL5021
Figure 14: Installing bezel
Finishing up
After you replace a drive in your VxRail Appliance, follow these steps to complete the process.
Procedure
1
Power on the node in which you replaced the drive. After VxRail Manager detects the new device,
the
Continue
button becomes active.
2
Click
Continue
.
3
Click
Restore ESXi Host
to take the ESXi host out of maintenance mode.
4
When the success message is displayed, click
Finish
to complete the process.
Replacing power supply units (PSUs)
VxRail Manager helps you identify failed power supplies in your VxRail Appliance so you can replace
them.
Your VxRail Appliance uses power supply redundancy, so a single faulty PSU can be removed and a new
one can be inserted without the system needing to be shut down.
Although VxRail Manager simplifies the replacement procedure, only qualified personnel should perform
these procedures.
Replacing hardware
VCE VxRail
™
Appliance 3.5 Product Guide
69
©
2016 VCE Company, LLC.
All Rights Reserved.