Figure 10 Inner rail over the first part of ball bearing retainer assembly
CL5094
4. Once the inner rails are properly engaged with the ball bearing retainer assemblies,
push the server into the cabinet until the slide rails are engaged and locked.
An audible click indicates that the slide rails are engaged and locked.
5. On the outside of each rail assembly, slide the blue disconnect tab forward to unlock
the server, and push the server completely into the cabinet (
Figure 11 Inserting the server in the cabinet
CL5006
6. To further secure the rail assembly and server in the cabinet, insert and tighten a
small stabilizer screw directly behind each bezel latch (
).
12
EMC SVR-I2U-R2312 Server Installation and Maintenance Guide
0