Figure 30 Installing the stabilizer screws
CL5008
Reconnecting cables
Plug all power and I/O cables that you removed from the original server into the back of
the replacement server.
Reinstalling the bezel
If a bezel covered the front of the server, reinstall the bezel using the procedure that
follows. Refer to
while performing the procedure.
Procedure
1. Pushing on the ends, not the middle, of the bezel, press the bezel onto the latch
brackets until is snaps into place.
2. If the bezel has a key lock, lock the bezel with the provided key and store the key in a
secure place.
30
EMC SVR-I2U-R2312 Server Installation and Maintenance Guide
0