Procedure
1. From the front of the cabinet, align rail alignment posts with the rear channel holes for
the selected cabinet space for the server, and insert the alignment posts securely into
the holes (
An audible click indicates that the connection is secure.
Figure 5 Inserting rail alignment posts into rear channel holes
CL5090
2. Pull the slide rail forward so the front alignment posts go securely into the holes on
).
An audible click indicates that the connection is secure.
Figure 6 Inserting rail alignment posts into front channel holes
CL5091
3. Secure the rail to the rear channel with a small stabilizer screw (
Installing the slide rails in the cabinet
9