
P 2500 - P 5000
28
Drawing 15
4.
Barriers P 2500 - P 4000:
Connect the barrier boom to the boom connector using the plastic screws
M8x50. Tighten the fastening nuts with a max. torque of 1.3lbf ft.
Use only the specific plastic screws M8x50. Screws with another specification
might prevent the tearing off of the barrier boom (predetermined shearing
point).
5.
Barriers P 5000:
Connect the barrier boom to the boom connector using the screws M8x70.
Tighten the fastening nuts with a max. torque of 14.8lbf ft.
Due to the use of the steel screws M8x70 at the barrier P 5000 the
predetermined shearing point and such the vandalism protection is not
applicable – other than with the barriers P 2500 - P 4000.
7.7
Balancing springs
1. Activate the mechanical emergency release of the barrier and place the
barrier boom manually in position OPEN.
2. Mount the number of balancing springs according to the boom length and
additional (optional) equipment if applicable (see table below).
Please note that for the different versions two types of pressure springs (F1.1
and F1.2) are used.
Boom length [in]
Model
78.74 98.41 118.11 137.80 157.48 177.17 196.85
P 2500
2x
F1.1
2x
F1.1
---
---
---
---
---
P 2500 with
2x
3x
---
---
---
---
---
Summary of Contents for P 2500
Page 14: ...P 2500 P 5000 13 4 Declaration of incorporation Drawing 2 ...
Page 20: ...P 2500 P 5000 19 7 2 Mounting dimensions Drawing 3 ...
Page 47: ...P 2500 P 5000 46 8 4 Circuit diagram Drawing 34 ...
Page 48: ...P 2500 P 5000 47 Drawing 35 ...
Page 49: ...P 2500 P 5000 48 Drawing 36 ...
Page 50: ...P 2500 P 5000 49 Drawing 37 ...
Page 51: ...P 2500 P 5000 50 Drawing 38 ...
Page 52: ...P 2500 P 5000 51 Drawing 39 ...
Page 55: ...P 2500 P 5000 54 10 Layout exploded drawing Drawing 41 ...