P 2500 - P 5000
25
Drawing 9
2. The barrier mechanics is preset at the factory so that the barrier boom can
perform a 90° - movement from the vertical to the horizontal position. The
barrier is delivered in open (vertical) position. The drive lever is over the
dead center at the mechanical stop (see drawing below). If necessary,
correct the position by pulling the drive lever (1) in direction OPEN -
towards access panel/roadway (arrow 2).
Drawing 10
3. Adjust the boom connector vertically using a water-level.
Summary of Contents for P 2500
Page 14: ...P 2500 P 5000 13 4 Declaration of incorporation Drawing 2 ...
Page 20: ...P 2500 P 5000 19 7 2 Mounting dimensions Drawing 3 ...
Page 47: ...P 2500 P 5000 46 8 4 Circuit diagram Drawing 34 ...
Page 48: ...P 2500 P 5000 47 Drawing 35 ...
Page 49: ...P 2500 P 5000 48 Drawing 36 ...
Page 50: ...P 2500 P 5000 49 Drawing 37 ...
Page 51: ...P 2500 P 5000 50 Drawing 38 ...
Page 52: ...P 2500 P 5000 51 Drawing 39 ...
Page 55: ...P 2500 P 5000 54 10 Layout exploded drawing Drawing 41 ...