
P 2500 - P 5000
22
Drawing 6
1
Fastening point (10.45 x 7.99)
2
Fastening point, re-adjustable (9.06 x 7.09in)
3
Clearance for cable entry (empty conduits) (7.87 x 5.75in)
4
Drilling template
5
Foundation
6
Direction roadway
WARNING!
Danger of injury by incorrect fixation of the barrier
housing on the foundation!
Loosening of the anchor bolts from the foundation.
During the fastening of the barrier obey the minimum
distance of the heavy duty anchor to the edge of the
foundation.
Summary of Contents for P 2500
Page 14: ...P 2500 P 5000 13 4 Declaration of incorporation Drawing 2 ...
Page 20: ...P 2500 P 5000 19 7 2 Mounting dimensions Drawing 3 ...
Page 47: ...P 2500 P 5000 46 8 4 Circuit diagram Drawing 34 ...
Page 48: ...P 2500 P 5000 47 Drawing 35 ...
Page 49: ...P 2500 P 5000 48 Drawing 36 ...
Page 50: ...P 2500 P 5000 49 Drawing 37 ...
Page 51: ...P 2500 P 5000 50 Drawing 38 ...
Page 52: ...P 2500 P 5000 51 Drawing 39 ...
Page 55: ...P 2500 P 5000 54 10 Layout exploded drawing Drawing 41 ...