DOUBLE DOOR FRAME ASSEMBLY
Each Door consists of:
1 unhanded door post
1 handed door post (handed post for left door is different profile to the handed right hand door post)
3 infill panels (1 with pre fabricated lock hole right hand door only) for lock barrel
1 top and bottom door panels
3 panels of glass which must be fitted during door assembly
It is not possible to fit glass after the door is built
From the main bag of fittings you require;
2 door wheels
1 clip on nylon door skid (this might already be fitted to the bottom door panel)
2 lengths of black brush draught excluder with PVC carrier
Door lock (right hand door only), self tapping screws and spring washers
12’ glazing beading
Door handles
3 PVC Glass strips
Left hand Door (viewed from outside)
Identify the correct door posts
. The handed door post for the left hand door has a bolt channel,
whereas the handed door post for the right hand door post does not.
(Key point).
1.
Place one unhanded post and the handed post for left hand door on a lev-
el surface roughly two feet apart with the bolt slots facing downwards.
(Unhanded door post on the left, handed door post on the right). The top
of each side post has two screw holes in it, the bottom has three.
(Key
point).
Slide the glazing beading into the groove of each bar i.e. only
one length of glazing beading per bar.
2.
Place the top, bottom and 3 infill panels in position as shown by the po-
sition of the screw holes in the side pieces and the panels. The top panel has the greenhouse
name on it. The bottom panel has the edge for the door skid to fit on. The lower infill panel
locks on to the bottom panel. The infill panel for the left hand door
does not
have a pre fabri-
cated hole for the lock barrel.
3.
Fix the left hand door post to the door panels by screwing through the door side pieces into
the holes provided in the edge of the panels with the self tapping screws. The screws will go
in more easily and with out danger of trying to go crooked if you can put a small amount of
grease on the screw before assembling the doors. Alternatively, you could insert the screws
into the screw eyes of the door panels before assembling the door; this would have the effect
of pre-self tapping the panels prior to assembly, making assembly easier.
4.
GLASS MUST BE FITTED TO EACH DOOR BEFORE THE 2ND DOOR POST IS
FITTED—KEY POINT
Summary of Contents for TITAN K800
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...GENERALASSEMBLY OF GREENHOUSE UNIT...
Page 24: ...DOOR FRAME ASSEMBLY...
Page 36: ...ELITE 1512...