4-11
R
Re
effrriig
ge
erra
attiio
on
n S
Sy
ys
stte
em
m
10. Slowly open the high-side manifold gauge
valve to allow the compressor to remove any
refrigerant trapped in the high-side hose and
the process fitting.
11. Close both of the manifold gauge valves. If the
high-side gauge reading rises, the pinch-off
must be corrected before proceeding.
12. Remove the high-side process tube adapter
and solder the process tube closed.
13. Clamp the low-side process tube with the
pinch-off tool while the unit is running.
Remove the low-side process tube adapter
and solder the process tube closed.
14. Check the process tubes for refrigerant leaks.
F
Fiin
na
all L
Le
ea
ak
k T
Te
es
stt
1. With the refrigerator turned OFF leak test all
low-side system components.
2.
Turn the unit ON and run until the condenser is
warm. Leak test the high-side system
components.
Evacuating and Recharging Connection
s
Summary of Contents for EILFU17GS
Page 2: ......
Page 56: ...5 16 C Co om mp po on ne en nt t T Te ea ar rd do ow wn n Notes ...
Page 57: ...6 1 I Ic ce e M Ma ak ke er r S Se ec ct ti io on n 6 6 I Ic ce e M Ma ak ke er r ...
Page 70: ...6 14 I Ic ce e M Ma ak ke er r Step 3 Step 4 Step 5 Step 6 ...
Page 71: ...6 15 I Ic ce e M Ma ak ke er r Step 7 Step 8 Step 9 Step 10 ...