39
11. Install new compressor in exact same manner as
original compressor.
12. Reform both suction and discharge lines to align with
new compressor. If they are too short, use additional
lengths of tubing. Joints should overlap 0.5” to
provide sufficient area for good solder joint. Clean
and mark area where tubing should be cut. Cut
tubing with tubing cutter. Work as quickly as pos-
sible to avoid letting moisture and air into system.
NOTE:
If low-side process tube is too short, silver
solder four inch piece of tubing onto process tube
at this time.
13. Solder all connections according to soldering
procedure outlined above.
14. Remove original filter-drier.
15. Install new filter-drier at condenser outlet.
16. Evacuate and charge system using recommended
procedure described under
Evacuating and
Recharging
on pages 44-45.
17. Reconnect compressor terminal leads in
accordance with refrigerator wiring diagram.
18. Reassemble unit.
Figure E1
CAUTION: DO NOT unbraze old filter-drier
from system. This will vaporize and drive
moisture from desiccant back into system.
The old filter-drier should be cut out of
system.
Summary of Contents for BEVERAGE CENTER II
Page 22: ......
Page 33: ...32 COMPRESSORWIRING Induction Run Compressor with Relay LADDER SCHEMATIC ...
Page 34: ...33 WIRING DIAGRAM ...
Page 61: ...60 ...
Page 62: ...61 ...
Page 63: ...62 ...
Page 64: ...63 ...
Page 65: ...64 ...
Page 66: ...65 ...
Page 68: ...67 Step 3 Step 4 Step 5 Step 6 ...
Page 69: ...68 Step 8 Step 7 Step 9 Step 10 ...
Page 70: ...69 Ice Maker Exploded View ...
Page 71: ...70 Ice Maker Wiring Diagrams Enlarged view ...
Page 77: ......