29
The Manufacturer declines any liability for inaccuracies con-
tained in the manual, if due to printing or translation errors.
Any supplements to the installation, use and maintenance
manual the Customer receives from the Manufacturer will form
an integral part of the manual and therefore must be kept
together with it.
D
TRANSPORT, HANDLING AND STORAGE
D.1
Introduction
Transport (i. e. transfer of the machine from one place to
another) and handling (i. e. transfer inside workplaces) must
occur with the use of special and adequate means.
CAUTION
The machine must only be transported, handled and stored
by specialised personnel, who must have:
• specific technical training and experience in the use of
lifting systems;
• knowledge of the safety regulations and applicable laws
in the relevant sectors;
• knowledge of the general safety rules;
• personal protection equipment suitable for the type of
operation carried out;
• the ability to recognize and avoid any possible hazard.
D.2
Handling
Arrange a suitable area with flat floor for machine unloading
and storage operations.
D.2.1
Procedures for handling operations
Before lifting:
• send all operators to a safe position and prevent persons
from entering the handling area;
• make sure the load is stable;
• make sure no material can fall during lifting. Manoeuvre
vertically in order to avoid impacts;
• handle the machine, keeping it at minimum height from the
ground.
For correct and safe lifting operations:
• use the type of equipment most suitable for characteristics
and capacity (e.g. electric pallet truck or lift truck);
• cover sharp edges;
• check the forks and lifting procedures according to the
instructions given on the packing.
D.2.2
Shifting
The operator must:
• have a general view of the path to be followed;
• stop the manoeuvre in case of hazardous situations.
D.2.3
Placing the load
• Before placing the load, make sure the way is free and that
the floor is flat and can take the load.
• Remove the appliance from the wooden pallet, move it to
one side, then slide it onto the floor.
D.3
Unpacking
IMPORTANT
Immediately check for any damage caused during
transport.
Inspect the packaging before and after unloading.
1. Remove the packaging.
Take care when unpacking and handling of the appliance
to not cause any shocks on itself.
2. Keep all the documentation contained in the packaging.
Note
• The forwarder is responsible for the goods during transport
and delivery.
• Make a complaint to the forwarder in case of visible or
hidden damage.
• Specify any damage or shortages on the dispatch note.
• The driver must sign the dispatch note: the forwarder can
reject the claim if the dispatch note is not signed (the
forwarder can provide the necessary form).
• For hidden damage or shortages becoming apparent only
after unpacking, request the forwarder for inspection of the
goods within and no later than 15 days after delivery.
D.4
Disposal of packing
The packing must be disposed of in compliance with the
current regulations in the country where the appliance is used.
All the packing materials are environmentally friendly.
They can be safely kept, recycled or burned in an appropriate
waste incineration plant. Recyclable plastic parts are marked
as follows:
Polyethylene
• Outer wrapping
• Instructions bag
Polypropylene
• Straps
Polystyrene foam
• Corner protectors
The parts in wood and cardboard can be disposed of,
respecting the current regulations in the country where the
machine is used.
D.5
Storage
The machine and/or its parts must be stored and protected
from damp, in a non-aggressive place, free of vibrations and
with room temperatures between – 10
℃
[14
℉
and 50
℃
[122
℉
].
The place where the machine is stored must have a flat
support surface to avoid deforming the machine or damage to
the support feet.
CAUTION
Do not make modifications to the parts
supplied with the appliance. Any missing
or faulty parts must be replaced with
original parts.
Summary of Contents for 10 GN 1/1
Page 3: ...3 Installation diagram 061 GN Gas model with boiler Touch and Digital code 597402000 ...
Page 4: ...4 Installation diagram 061 GN Gas model boilerless Touch and Digital code 597401Z00 ...
Page 6: ...6 Installation diagram 062 GN Gas model with boiler Touch and Digital code 597402600 ...
Page 7: ...7 Installation diagram 062 GN Gas model Boilerless Touch and Digital code 597402500 ...
Page 9: ...9 Installation diagram 101 GN Gas model with boiler Touch and Digital code 597402300 ...
Page 10: ...10 Installation diagram 101 GN Gas model Boilerless Touch and Digital code 597402200 ...
Page 12: ...12 Installation diagram 102 GN Gas model with boiler Touch and Digital code 597402900 ...
Page 13: ...13 Installation diagram 102 GN Gas model boilerless Touch and Digital code 597402800 ...
Page 14: ...14 Installation diagram 201 GN Electrical Model Boilerless Touch and Digital code 597402P00 ...
Page 15: ...15 Installation diagram 201 GN Gas Model with boiler Touch and Digital code 597402Q00 ...
Page 16: ...16 Installation diagram 201 GN Gas Model Boilerless Touch and Digital code 597402R00 ...
Page 18: ...18 Installation diagram 202 GN Gas Model with boiler Touch and Digital code 597402W00 ...
Page 19: ...19 Installation diagram 202 GN Gas Model boilerless Touch and Digital code 597402X00 ...
Page 45: ......
Page 46: ...Electrolux Professional SPA Viale Treviso 15 33170 Pordenone www electrolux professional com ...