Doc
#
E204701
TOC-3
Table of Contents
Electro
Industries/GaugeTech
™
Powered by Innovation™
2.10: Step 10: Additional Configuration 2-17
2.10.1: Use the Web Configurator to Configure IP Address for
BACnet IP and EtherNet/IP 2-17
2.10.2: Set Up a Password 2-21
2.10.3: Configure the ProtoCom-Lon 2-23
2.10.4: Configure the Ethernet Device Connection 2-25
3.1: LED Diagnostics for Modbus RTU Communications Between
ProtoCom/ProtoCom-Lon and Devices 3-1
3.1.1: No Communication on Modbus RTU (Meter) Side 3-2
3.1.2: Field Communication Problems 3-2
3.2: Lost or Incorrect IP Address 3-3
A: Protocol Data Points for EIG Meters A-1
A.3: Nexus® 1252/1262/1272 Meters A-7
A.6: MP200-Y Metering System A-12
A.7: MP200-S Metering System A-16