
Electro
Industries/GaugeTech
™
Powered by Innovation™
Doc
#
E204701
1-14
1: Introduction to the ProtoCom/ProtoCom-Lon
To remove the unit from the DIN Rail:
1. Push down on the unit to compress the butterfly spring.
2. Pull the bottom of the unit away from the DIN Rail to release the bottom edge of
the clip.
3. Unhook the clip from the top of the DIN Rail.
1.9.2: Mounting on a Panel
The ProtoCom/ProtoCom-Lon has mounting holes in its tabs for installation in a panel.
Figure 1.12: Location of Mounting Holes
1. Using a #1 flat-blade screwdriver, unscrew the two screws holding the DIN Rail clip
to the back of the ProtoCom/ProtoCom-Lom (see Figure 1.11) and remove the clip.
2. Verify that the area where the unit is to be mounted allows proper clearance for all
connections and mount the unit using the holes provided, spaced 3.25" apart.
Mounting Holes