![elco THISION L PLUS Operating Manual Download Page 84](http://html1.mh-extra.com/html/elco/thision-l-plus/thision-l-plus_operating-manual_2377082084.webp)
84
Caution:
After panelling removal, 230V
parts can be reached. Boiler
inspection is only to be carried
out by qualified staff.
Removal of frontal panelling
The front panelling must first be
removed, to be able to carry out
maintenance on the boiler.
1. Unscrew the 2 screws of quick-
locks on top of frontal panel (A).
Push the quik locks (B) and remove
the frontal panel (C), (D) (= air box).
Removal of top panelling
Top panelling must be removed to be
able to reach the burner control unit.
2. Press both external sides of the
control unit HMI (E) and rotate
the display (F).
3. Pull the top panelling in a forward
motion (G), (H).
Commissioning
Inspection
The panelling of the equipment
consists of metal and plastic parts,
which can be cleaned with a mild
(non-aggressive) cleaning agent.
When carrying out maintenance works,
only original ELCO replacement parts
may be used.
Checks prior to commissioning
Changing settings such as burner
pressure and setting the amount
of air is not necessary.
Only in the case of failures or
replacement of the gas unit, venturi
and/or ventilator, does one have
to check and adjust the O
2
/ CO
2
percentage accordingly.
Following maintenance tasks
always check all gas-conducting
components on leakages by use
of leakage detection fluid (LDF).
(2x)
(2x)
A
C
B
D
E
G
H
H
F
1
2
3