Installation
Cascade free-standing in line
1. Position the pipe work header in
the required location. When using
several pipe work headers: couple
the pipe work headers using the
supplied gaskets, M12 (DN65) or
M16 (DN100) bolts, spring washers
and nuts. Align the pipe work
header(s) horizontally using the
adjustable feet.
2. Place the gas line in its intended
recess. When using several pipe
work headers: couple the gas lines
using the supplied DN65 gaskets,
M12 bolts, spring washers and
nuts.
Fasten the gas line with the 2
special close tolerance bolts
M6x8x16 on each flange of the
pipe work header(s).
3. Fit the I-columns on the flange plate
using 2-x bolt M8x110mm.
Attention: Use the correct holes
in the column!
When using a left flange plate:
use the right-hand holes in the
column.
When using a right-hand flange
plate: use the left-hand holes in
the column.
4. Fit a lower spacer on the front
of each I-column using 2-x bolt
M8x16mm.
Fit a lower spacer on the back
of each I-column using 2-x bolt
M8x16mm.
5. Fit the upper beam on each
I-column using 2-x bolt M8x50 mm.
6. Hang the boilers on the back
suspension Brackets.
For the lifting refer to “Lifting
and carrying precautions”
on page 18.
Continue with page 24.