
6 PREPARATION AND INSTALLATION
ELBO CONTROLLI srl
SETHY SIX
6 PREPARATION AND INSTALLATION
6.1 Packing list
Before proceeding with preparation and installation, check that the tool presetter packaging contains the
following components:
PRESET MOD.
SETHY SIX
ROTATING SPINDLE
ISO 30
ISO 40
ISO 45
ISO 50
HSK 63
…………
…………
….…….
RESETTING GAUGES
ISO 30
ISO 40
ISO 45
ISO 50
HSK 63
…………
…………
….…….
REDUCERS
ISO ........... VDI ..…........
other .........………….......
MINI-LABELLING MACHINE ..….....………..
LABELS ………...………...
FEEDER
OPERATION MANUAL (PDF)
TEST REPORT
WARRANTY
DUST COVER
CHECKED BY..............................................
Page 10 of 96
Summary of Contents for SETHY SIX
Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL rev 1 0 05 13...
Page 15: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 15 of 96...
Page 16: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 16 of 96...
Page 38: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 38 of 96...
Page 39: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 39 of 96...
Page 65: ...9 212V VISION SYSTEM ELBO CONTROLLI srl SETHY SIX Page 65 of 96...
Page 93: ...18 ELECTRICAL DIAGRAM ELBO CONTROLLI srl SETHY SIX 18 ELECTRICAL DIAGRAM Page 93 of 96...
Page 94: ...19 PNEUMATIC DIAGRAM ELBO CONTROLLI srl SETHY SIX 19 PNEUMATIC DIAGRAM Page 94 of 96...