DK50 9x4VRT/M
10/2018
NP-DK50-9x4VRTM_ED-EN-2_10-2018
- 33-
Tab. 3
Time interval
once
a day
once
a
week
once
a
year
once
every
2
years
2000
4000
6000
8000
10000 12000
16000
Chapter
Set of spare
parts
Performed by
Replacement of compressor
fans (6-8bar)
x
035300016-000
Replacement of compressor
fans (8-10bar)
x
035300016-000
Check electrical connections
x
x
x
x
x
x
18.4.
-
qualified
professional
Check operation of check
valves
x
x
x
18.10.
qualified
professional
Check pressure sensor
operation
x
x
x
x
x
x
18.13.
qualified
professional
Check pressure relief valve
x
x
x
x
x
x
18.
qualified
professional
Check temperature sensor
switching function
x
x
x
x
x
x
18.12.
qualified
professional
Replacement of piston group
with bearing
(6-8bar)
x
x
604031764-000
qualified
professional
Replacement of piston group
with bearing
(8-10bar)
x
x
604031764-000
qualified
professional
Check safety valve operation
x
x
x
x
18.6.
qualified
professional
Check solenoid valve
operation
x
x
x
18.11.
qualified
professional
Compressor intake filter
replacement
x
x
x
x
x
x
18.5
604031761-000
qualified
professional
Compressor performance
check
x
x
x
x
x
x
18.9
qualified
professional
Conduct a "repeated test"
pursuant to EN 62353
x
18.1
qualified
professional
Check pneumatic
connections for leaks
x
x
x
x
x
x
18.3
-
qualified
professional
(*) enclosed compressor
Summary of Contents for DK50 9x4VRT/M
Page 1: ...DK50 9x4VRT M User manual EN...
Page 2: ...October 2018 Z_2195 2018 Chap 3 pgs 5...
Page 22: ...DK50 9x4VRT M NP DK50 9x4VRTM_ED EN 2_10 2018 22 10 2018 Fig 13 Fig 14 Fig 15 Cable bridge...
Page 42: ...DK50 9x4VRT M NP DK50 9x4VRTM_ED EN 2_10 2018 42 10 2018 ANNEX 22 MAPPING PARAMETERS...
Page 43: ...DK50 9x4VRT M 10 2018 NP DK50 9x4VRTM_ED EN 2_10 2018 43...