9
www.ehs-heating.com
7.
Installation steps
7.1.
Positioning and Wall Mounting the Boiler
IMPORTANT:
When choosing a location to mount the boiler it is important that you consider clearance, servicing
of the boiler, and safe and suitable operation.
When power is supplied, the boiler should only ever be opened by a qualified electrician after first
isolating the electrical supply.
The boiler should be fitted out of the reach of children and people without the right skills and
qualifications. If there is the possibility that the boiler could be opened without first isolating the electrical
supply then you must install it in a fashion that prevents access to the boiler, such as a lockable cupboard.
The wall that you choose to mount this boiler on should be strong enough to support the boiler
when full.
EHS recommend at least 100mm clearance from all fixed obstructions on all sides of the boiler. Allow plenty of space
at the base of the boiler for fitting the hot and cold-water pipes and isolation valves.
Step 1.
Drill 5 holes as per the included wall mounting diagram. The upper 3 holes should be Φ8mm
diameter, and the lower 2 holes Φ6mm.
Step 2.
Secure the 3 Φ8mm expansion bolts into the top three holes
Fig 1
Fig 2
Step Three :
Hang the boiler from the top three bolts before securing the boiler to the wall using standard
fastenings at the bottom