34
www.ehs-heating.com
34. A central heating inhibitor (Fernox or equivalent) is required to be added to the system during installation and
thereafter at regular intervals using the correct dosage.
35. A magnetic filter requires to be installed on the return of every Boiler. This must be cleaned at every yearly
service.
36. Existing systems require to be pressure flushed correctly and final TDS reading recorded on the commissioning
paperwork.
37. This Warranty does not cover the following:
• Parts which fail due to system debris, contamination and/or water quality issues,
• Boilers installed within mobile leisure accommodation. e.g., Boats, Mobile Caravans.
• Any extra costs incurred whilst undertaking a repair due to incorrect installation
• Products that have been moved from their original place of installation.
• Costs of each annual service, including consumable parts such as seals and chemical treatments (inhibitor etc.)
• Any repair that is needed because of anything other than a fault to the Boiler or failure of the Boiler itself.
• Any 3rd party damage, whether accidental, negligent, malicious, or otherwise.
• Theft or attempted theft.
• Any fault or failure in the heating system to which the Boiler is connected.
• Any other costs or expenses caused by or arising because of a repair.
• Any damage caused by hard water scale deposits or sludge resulting from corrosion.
• Any problems caused by inadequate supply of services such as electricity or water to the property including loss of
power.
• Boilers where:
• EHS Genuine Parts have not been used in any service or repair or
• They have not been Installed and set up strictly in line with the installation instructions supplied with them
(including the requirement to clean the system and add corrosion inhibitor in line with BS7593:1992); or
• They have not been maintained strictly in line with the maintenance instructions supplied with them.
EHS Customer Service
Contact us on
Email –
Phone- +44 (0)345 8628699