
Installation & User Manual - Sampling Systems
Version 140618 UK
Page 8
R
E
f
con
Carry-Box Enclosure
A)
Handle
B)
Operating panel
C)
Vacuum chamber
D)
Pincher
E)
Splash board
F)
Connectors
G)
Power supply
H)
Suspension bracket
2.3
Installation
2.3.1
Mechanical
First determine where the sampler must be placed (in case of an ILS
system) before installing the enclosure. This way you can check if the
sample hose (from sampler to enclosure) has a gradual slope.
Efcon
omy enclosure
Place the enclosure on a firm horizontal (water-levelled) ground and fix
the enclosure with the two supplied SS mounting brackets, bolts and
plugs.
BE CAREFULL!
Don’t turn the M6 bolt too tight in the enclosure.
Beneath the enclosure a condensate drain outlet is fitted. The outlet has a
push-in fitting for 8 mm tubing. See fig. 2.3a.
Carrybox enclosure
This enclosure is only available for vacuum and peristaltic samplers.
Mount ±300 mm DIN-rail horizontal to the wall on which the enclosure is
placed. Make sure there is sufficient height for an gradual, siphons free
and nod free sample drain to the container.
A
D
D
A
B
C
E
F
F
H
Fig. 2.3a
Fig. 2.2b
G
Summary of Contents for omy
Page 44: ...Installation User Manual Sampling Systems Version 140618 UK Page 44 ...
Page 45: ...Installation User Manual Sampling Systems Version 140618 UK Page 45 ...
Page 46: ...Installation User Manual Sampling Systems Version 140618 UK Page 46 ...
Page 47: ...Installation User Manual Sampling Systems Version 140618 UK Page 47 ...
Page 48: ...Installation User Manual Sampling Systems Version 140618 UK Page 48 ...