![Edwards STP-301 Series Instruction Manual Download Page 23](http://html.mh-extra.com/html/edwards/stp-301-series/stp-301-series_instruction-manual_2366166023.webp)
STP-301/451 Series Instruction Manual
4-1
Installation
4
Installation of the STP Pump
4.1
Name and Function of Each Part
(1) Inlet Port Flange (ICF
*1
, VG
*1
, ISO, and other)
Connected to the vacuum equipment (at the high vacuum side).
(2) Outlet Port Flange (KF
*2
25)
Connected to the inlet port side of the backing pump.
(3) STP Connector (41 pins)
Connected to the STP connection cable.
(4) Ground Terminal
Used for grounding.
Connect the ground cable between this terminal and the ground terminal of
the STP control unit.
The ground terminal is marked with
label.
(5) Purge Port (KF
*2
10)[Chemical Specific Pump (Type C)]
Introduces a purge gas.
This port is attached only to the chemical specific pump (type C). In order
to protect the inside of the STP pump when pumping reactive or corrosive
gases. The STP pump is delivered with a blank flange attached to this port.
*1
: JVIA Standard
*2
: JIS