4-2
Output Pin Selection Jumper
The electronic signal from the A/E transducer may be output to another Accusetter II or
to an external device connected to the analog buss. The pin on which the signal is output,
from 1 to 6, can be selected using the "A OUT" jumper. The "B OUT" jumper is not
used on the E9330 module.
To select an output pin position the "A OUT" jumper so that it is on the desired number
pin and the center pin in the three pin group. For example, to output the signal on pin 5
place the jumper on the pin below marked "5" and the center pin between the "5" and "6".
Any device connected to the analog buss can now access the signal from pin number 5.
The "A OUT" jumper only has to be set if the signal is to be bussed to another column. If
the signal is not to be output the jumper should be place on one pin only.
NOTE:
To buss a signal from one Accusetter II to another connect an interface cable,
Edmunds #4550200, from the "Output" connector on the rear of one column to the
"Input" connector on the rear of the next column. Multiple columns can be connected in
this way.
See LVDT Module,
Input Jumper Setup
below for information on inputting signals from
other columns.
Shown in idle position. Does not output signal to buss.
Figure 4.2 - Output Pin Jumper
Summary of Contents for Accu-Setter II
Page 2: ...A Accu Setter II User s Manual Edmunds GAGES...
Page 16: ...2 3 2 3 Overall E9300Unit Figure 2 1 Accusetter II Basic Unit E9300...
Page 18: ...2 5 Figure 2 2 Front Panel...
Page 20: ...2 7 Figure 2 3 Rear Panel...
Page 32: ...3 4 Figure 3 3 Air Connections For Air Gaging Application Only...
Page 39: ...3 11 An example of various multipliers as related to diameter measurement follows...
Page 40: ...3 12 The last consideration to complete the formula is the gaging function See examples below...
Page 43: ...PROGRAMMING SINGLE CHECK MEASUREMENT 3 15...
Page 44: ...PROGRAMMING SINGLE CHECK MEASUREMENT 3 16...
Page 50: ...PROGRAMMING MULTIPLE CHECK MEASUREMENT 3 22...
Page 51: ...PROGRAMMING MULTIPLE CHECK MEASUREMENT 3 23...
Page 59: ...PROGRAMMING MULTIPLE FIXTURE MEASUREMENT 3 31...
Page 60: ...PROGRAMMING MULTIPLE FIXTURE MEASUREMENT 3 32...
Page 90: ...4 5 Figure 4 3 A E Block...