22
Doors &
Windows
Combustion air and vent termination
must be 12" (300mm) from or below
doors, windows or gravity inlet.
Forced Air
Inlet
Terminate venting system 3’ (0.9 m)
above and 10' (3.0 m) from any forced
air inlet (except boiler’s combustion
air inlet).
"L"
Corner
Vent termination shall NOT be installed
closer than 3' (0.9 m) from inside
corner of “L” shaped structure.
Grade, Snow
& Ice
Terminate vent system bottom,
minimum 12" (300 mm) above highest
anticipated snow level.
Avoid locations where snow may drift
and block vent and combustion air. Ice
or snow may cause boiler to shut down
if vent or combustion air becomes
obstructed.
Condensate
Vent gas may condense, forming
moisture, may be corrosive. Protect
building materials at vent from exhaust
of vent gas.
6 - COMBUSTION AIR AND VENT PIPING
Termination must
be 12" (30.5 cm)
from or below doors,
windows or gravity
inlet.
12"
(30.5cm m)
Minimum
Termination
Forced Air
Inlet
3' (0.9 m)
[If located
within 10' (3 m)
of forced air
inlet]
Termination
Less than
10' (3 m)
Minimum
3' (0.9 m)
Minimum
Summary of Contents for SSC Olsen OLSSC-050
Page 46: ...46 13 TROUBLE SHOOTING ...
Page 53: ...53 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Page 54: ...54 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Page 71: ...71 Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 72: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13504 4729 web site www ecrinternational com ...