33
9-4 Combustion Analyzer Port
9-5 Burner Flame
Flame
Flame
Burner
9 - START UP PROCEDURE
NOTICE
Combustion analyzer port is provided. After use
replace cover.
Look for BLUE fl ame
with slight YELLOW tips
evenly spaced around
burner
Verify Burner, Proper Operation
Inspect burner fl ame through Sight Glass. See
1.
fi gure 9-5.
Operate boiler through several heating cycles,
2.
including domestic hot water, if used. Verify proper
operation.
Reset control parameters to operating settings if
3.
adjusted to allow startup and operation test.
Follow instructions TO TURN OFF GAS TO APPLIANCE
4.
if boiler is not being placed into immediate operation.
Enter installer information on Warranty Registration
5.
Card.
Gather all instructions, manuals, wiring diagrams,
6.
warranty registration card and other supporting
information. Review with user and/or affi x in
conspicuous location adjacent to boiler.
Combustion Analyzer Port
In-line Pressure Switch
Vapor Collector
Summary of Contents for 075 97gb
Page 56: ...56 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Page 57: ...57 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Page 73: ...73 ...
Page 74: ...74 ...
Page 75: ...75 ...