![EcoFasten Clickfit Installation Manual Download Page 27](http://html1.mh-extra.com/html/ecofasten/clickfit/clickfit_installation-manual_2354081027.webp)
VERSION: v3.0
REVISION DATE: 12/2/22
INSTALLATION GUIDE
ACCESSORIES
PAGE
26
JUNCTION BOX PREPARATION
Prior to installation, use step drill bit to place pass through holes for conduits or
water-tight connectors. Drill bit starter locations are provided on the sides and
front of enclosure. Do not install conduit facing up roof.
JUNCTION BOX INSTALLATION
RAIL INSTALLATION
Use rail-specific MLPE mounting hardware to attach Rail Hangers to rail. Ensure junction
box is pushed as close to the rail as possible. Torque to 80-in lbs(1/2” or 7/16” socket),
do not overtighten.
*If installing in areas with ground snow loads greater than 40 psf, install Junction Box under module directly next to module
frame edge.