![EcoFasten Clickfit Installation Manual Download Page 13](http://html1.mh-extra.com/html/ecofasten/clickfit/clickfit_installation-manual_2354081013.webp)
VERSION: v3.0
REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
TILE HOOK SUB-FLASHING INSTALLATION
1. EcoFasten recommends following the
TRI guidelines three-course sealing
method. Start the three-course sealing
method by applying a layer of roofing
mastic over the edges of the tile hook
sub-flashing.
2. Place strips of reinforcing fabric over
mastic to cover approximately 2" from
the edge of the sub-flashing in both
directions. Place strips on the side first,
then the top edge.
3. Apply a final layer of mastic to
completely cover the reinforcing fabric.
The flashing is now installed and sealed.
1
1
2
2
3
3
PAGE
12