![EcoFasten Clickfit Installation Manual Download Page 26](http://html1.mh-extra.com/html/ecofasten/clickfit/clickfit_installation-manual_2354081026.webp)
VERSION: v3.0
REVISION DATE: 12/2/22
INSTALLATION GUIDE
ACCESSORIES
PAGE
25
MODULE MAINTENANCE AND SERVICING
During servicing or maintenance, module removal may disrupt the bonding
path and could introduce the risk of electric shock. If module removal is
required for servicing, then a Module Jumper shall be installed to the adjacent
modules to maintain the bond path. Modules should only be removed by
qualified persons in compliance with the instructions in this manual.
Bond Path
Grounding Lug
Equipment Grounding
Conductor (EGC)
generally to earth
ground
Brackets/Mid-Clamps
Module Jumper