IAQH-1000 Manual
INSTALLATION FORM & CHECKLIST
Job Location:
Technician Name:
Unit Model Number:
Unit Serial Number:
Job Elevation:
System Voltage Off:
System Voltage Full Load:
Gas Type:
Inlet Gas Pressure with Machine Off:
Inlet Gas Pressure at High Fire:
Set Air Ratio Regulator for appropriate fuel (Propane or Natural Gas, see section 4.3)
Manifold Pressure @ High Fire:
Checklist
Unit Clean and Fully Assembled:
Air Ducts clear and clean, sensors mounted and tight
Warn personnel of impending startup
Leak test all gas components
Electrical connections tight, appropriate wire size connected to the unit, unit grounded
in accordance with local electrical regulations
Pull test all wiring and visual inspection of electrical items
Tune Low Fire Bypass
79
Summary of Contents for IAQH Series
Page 2: ...2 Eco Power Equipment Ltd ...
Page 21: ...IAQH 1000 Manual 21 ...
Page 22: ...IAQH 1000 Manual 22 ...
Page 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Page 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...