IAQH-1000 Manual
Fig. 5 -Vent installation shall confirm with local codes or in the absence of codes with the National Gas and Propane
Installation Code, CSA B149.1, CSA B149.3, or ANSI Z223.1/NFPA 5
1. Maximize the height of the vertical run of the vent pipe. A minimum of three feet
(0.91 m) of vertical pipe is required at the heater. The top of the vent must extend at
least three feet (0.91 m) above the highest point on the roof. A weatherproof vent cap
must be installed to the vent termination. Ensure there are no building air intake vents
or windows near exhaust venting system
41
Summary of Contents for IAQH Series
Page 2: ...2 Eco Power Equipment Ltd ...
Page 21: ...IAQH 1000 Manual 21 ...
Page 22: ...IAQH 1000 Manual 22 ...
Page 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Page 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...