2
CONTENTS
SECTION 1
– GENERAL ................................................................................................................................................................ 3
1.1
INTRODUCTION ..................................................................................................................................................... 3
1.2
TRANSPORTATION, PACKING & STORAGE ........................................................................................................ 3
1.3
RECEIVING INSPECTION ...................................................................................................................................... 3
1.4
HANDLING .............................................................................................................................................................. 3
1.5
WARRANTY ............................................................................................................................................................ 3
SECTION 2
– INSTALLATION ....................................................................................................................................................... 4
2.1
LOCATION .............................................................................................................................................................. 4
2.2
FOUNDATIONS ....................................................................................................................................................... 4
2.3
PUMP PIPING CONNECTIONS .............................................................................................................................. 4
2.4
STRAINER PROTECTION ...................................................................................................................................... 4
2.5
COUPLING ALIGNMENT ........................................................................................................................................ 4
SECTION 3
– OPERATION ............................................................................................................................................................ 5
3.1
DESCRIPTION ........................................................................................................................................................ 5
3.2
LUBRICATION ......................................................................................................................................................... 5
3.3
PRE-STARTUP CHECKLIST .................................................................................................................................. 5
3.4
operational checks ................................................................................................................................................... 5
3.5
PERIODIC INSPECTION ........................................................................................................................................ 5
SECTION 4
– MAINTENANCE ....................................................................................................................................................... 5
4.1
PREPARATION FOR DISASSEMBLY .................................................................................................................... 5
4.2
DISASSEMBLY ....................................................................................................................................................... 5
4.2.1
Pressure Relief Valve ...................................................................................................................................... 5
4.2.2
Pump ............................................................................................................................................................... 6
4.3
INSPECTION ........................................................................................................................................................... 6
4.4
SPARE PARTS ........................................................................................................................................................ 6
4.5
REASSEMBLY - PRELIMINARY ............................................................................................................................. 6
4.6
REASSEMBLY ........................................................................................................................................................ 7
4.6.1
Pump ............................................................................................................................................................... 7
4.6.2
Pressure Relief Valve ....................................................................................................................................... 7
SECTION 5
– PARTS DESIGNATION ............................................................................................................................................ 8
SECTION 6
– TROUBLESHOOTING ........................................................................................................................................... 10
APPENDIX A
– DECLARATION OF CONFORMITY .................................................................................................................... 11
IMPORTANT NOTES
1.
This Publication is
TYPICAL ONLY
and only relates to the specifications of the minimum equipment required to ensure the
optimum performance, maximum life and trouble-free operation of the Ebsray V2000, V3000 & V3010 Pumps.
2.
Products with the mandatory European CE mark affixed indicate conformity to the essential health and safety requirements
via their applicable EU Directives (e.g. ATEX 94/09/EC, Machinery 98/37/EC etc).
As certain specific products/equipment outlined in this Publication are CE marked (meaning the equipment has been
assessed and supplied in conformity to those Directives),
STRICT
ADHERENCE
with
ALL
the instructions and
recommendations forms an essential part in maintaining the product/equipment’s conformity.
Failure to comply with the instructions and recommendations contained in this Publication may void CE
conformity.
3.
This Publication does
NOT
depict:
a) Ancillary required equipment related to the fabrication, installation and operation of the Pump e.g. miscellaneous flanges,
fittings etc.
b) Required equipment unrelated to the Pumpset e.g. tank fill lines, vapour return lines, emergency shutdown systems etc.
c) The materials and method of fabrication of any required sub-systems.
4.
It is the responsibility of the designer, fabricator and the installer of each required sub-system to ensure that:
a) The Ebsray specifications within this Publication and any other relevant Ebsray documents are
STRICTLY
adhered to.
b) Any variation (including use of equipment deemed "Equivalent") or addition to the Ebsray Specifications, as related to the
Pumpset and Pumping System in general, meet Ebsray's minimum requirements.
c) All design, fabrication and installation of the tank and sub-systems is
STRICTLY
in accordance with all relevant National,
State and Local Directives, Standards, Codes and Regulations.
5.
Ebsray reserves the right to:
a) Withdraw or alter any or all of the Ebsray specifications within this Publication and any other relevant Ebsray documents
without notification.
b) Determine the validity of any Warranty claims for Ebsray equipment based on the proper application of Ebsray supplied
equipment by the way of adherence to the Ebsray specifications within this Publication and any other relevant Ebsray
documents.
EBS-RAY PUMPS Pty. Limited
628 Pittwater Road
Brookvale NSW 2100 Australia
Phone: (+612 9905 0234)
Fax:
(+612 9938 3825)
www.ebsraypumps.com.au
or
Contact Ebsray Representative: