![Eaton US-S ESF30 28-P Mounting And Operating Instructions Download Page 45](http://html1.mh-extra.com/html/eaton/us-s-esf30-28-p/us-s-esf30-28-p_mounting-and-operating-instructions_525375045.webp)
45
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
Battery
Address
Switched maintained light via external
DLS-bus-module
In this switching mode one light switch of the general
lighting is scanned and assigned to the SWR 150 via
programming.
An advantage is the free assignment of the light switches
to the final circuit.