33
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
4.4.2 DC/DC Converter.2
This unit provides the central battery system with 24V and 6V
direct voltage.
Supply only for optional AC-module.
Attention:
When using at least two DC-DC converter please
observe that all DC-DC converter has to be used side by side
on the same module assembly frame.
Light-emitting diodes
O
O
24 V external The LED lights up when the external 24V DC
is present at the terminal 24V DC OUT.
O
O
24 V internal The LED lights up when the interal 24V DC
voltage is present at the ZB-S system.
O
O
6 V internal
The LED lights up when the interal 6V
supply voltage is present.
The „Service PIN“ button is located behind the hole.
Additional Features:
O
O
24 V external
O
O
20 W continuous output
O
O
outgoing circuit over frontline plug
O
O
voltage galvanic separated
O
O
24 V internal
O
O
100 W continuous output
O
O
140 W top performance (20 msec.)
O
O
supply of max. 26 SKU of type 2 x 3A and 1 x 6A as well
as 13 SKU of type 4 x 1,5A
O
O
Parallel switching of several converters possible! Please
attend that the converter has to be installed side by side.
O
O
Supply via AC/AC converter for an external mains supply is
possible!
4.4.2.1 AC-Module
This optional unit supplies the central battery system with an
AC-voltage
galvanically isolated, in mains operation.
Connection to terminals 1~ 2 IN to DC/DC converter.2.
ATTENTION!
Only the AC-module has to be connected to this terminals.